Digital Living was contacted to manage the relocation of an orthopedic manufacturers office space to Mira Mesa. Digital Living was to remove and relocate all technology infrastructure and design and install the layer 1 infrastructure for their new office space. The project included the 20 stations, 4 CAT6 per station to each location. Also included was a 450ft DMARC CAT5 extension that would allow DID's, VOIP and their Hi-Cap circuit to be extended into their suite for security reasons. All cable was terminated on CAT6 patch panels that allowed for future flexibility and ease of MAC's (moves, adds, and changes). The layer 1 work was done in under 4 days and once completed the network infrastructure was to be installed and tested. This project went without any issues and to this day we continue service a satisfied client.